All services

On the job site

Project management

Michael reviews the order of work, materials, and layout before installation. When site conditions change, he helps resolve placement and material decisions using the drawings as a guide.

A crew positions a palm with lifting equipment by the beach at Little Cayman Beach Resort Palm installation New deck, pool seating, and palms next to the beach at Little Cayman Beach Resort Finished deck
Little Cayman Beach Resort. The first phase paired a new pool deck with beachside palms to open a view of the Caribbean and provide shade.

What Michael does

From the first stake to the last detail

  1. Set the order of work

    Review the layout and materials before the crew starts. Make room for the work that needs access early.

  2. Work through site changes

    Refer to the drawings when placement or materials need to change during installation.

  3. Walk the finished space

    Review planting, paths, and lighting together and look at how the finished space will be used.

Project example

Old Northeast backyard

Clay brick paving links the pool and dining terrace. A pergola and outdoor kitchen were also part of the renovation.

View photo

Talk through your installation

Share your drawings or current plans and tell Michael where you are in the project.